• A used GPY1100/180 cone crusher
  • A used GPY1100/180 cone crusher
  • A used GPY1100/180 cone crusher
  • A used GPY1100/180 cone crusher
  • A used GPY1100/180 cone crusher
  • A used GPY1100/180 cone crusher
  • A used GPY1100/180 cone crusher

A used GPY1100/180 cone crusher

The mainframe is maintained well in the process of use, the mainframe frame is not too worn, the upper and lower frame body is loose, and the lathe is used to calibrate and process the cone, so that the contact rate of the upper and lower frame body reach

Service telephone:152-2543-9821

Enterprise email:luoyangruike@163.com

  • Detailed information

Luoyang Ruike recycling technology co., LTD. Recycling of luoyang dahua GP1100/180 horizontal hydraulic cone crusher three sets of equipment prior to service in some iron mine, the mine production controlled resources shortage and environmental reasons, had two lines to shut down a, through our efforts to undertake one of the production line recovery, 18 sets of design equipment, repair and maintenance is now back to the company. The rest of the equipment is still in production. Technical parameters of the equipment are as follows:

1. Feed size (mm):≤180

2. Processing capacity (t/h):150-200

3. Motor power :160KW

4. Machine weight (kg):19300

The mainframe is maintained well in the process of use, the mainframe frame is not too worn, the upper and lower frame body is loose, and the lathe is used to calibrate and process the cone, so that the contact rate of the upper and lower frame body reaches the new machine standard, and the new lining board is replaced, and the combination degree of the lining board cone and the upper frame body cone reaches the acceptance standard.

The machine tool on the spindle is corrected, the eccentric copper sleeve is renewed, and the worn position of the spindle is polished to reduce the friction force with the shaft sleeve as far as possible, thus making the machine run efficiently. Replace the spindle sleeve, the bearing of the upper frame body, and replace the new parts in the key parts of rotation to ensure the long-term and stable use of the equipment.

Check the high pressure part, replace the high pressure oil seal, the pressure holding effect is better, the discharge control particle size is good, the eccentric sleeve has no obvious size deviation, grind the upper, middle and lower friction plates, with a higher contact rate, check the gear deviation, grind the gear contact rate, clear the grinding disassembly process of the hit position, as far as possible one-time installation in place.

Equipment reinstallation test machine, spray painting, motor, electric control, hydraulic station online test machine one-time test machine qualified, equipment sent to the customer site, after two days of installation, wiring and debugging, to achieve good results, get customer praise.



Telephone counseling:152-2543-9821